Installing cold storage in District 1 with prestige and clear quotes at home

District 1 is the busiest economic center of Ho Chi Minh City, home to numerous restaurants, hotels, supermarkets, and high-end food businesses. The demand for... Cold storage installation in District 1 To ensure goods are stored in a facility that meets very high quality standards, however, given the limited space and strict noise control requirements, finding a professional contractor is not an easy task.

Tan Long – With over 20 years of experience in the industrial refrigeration industry, we are proud to be a strategic partner providing solutions. cold storage Complete package, meeting all stringent technical standards in District 1.

Tan Long - Specializing in the installation and construction of cold storage facilities in District 1.

In bustling central areas like District 1, Tan Long We not only provide new installation services but also offer solutions that optimize space and provide superior energy savings for your system. cold storageWe understand the specifics of construction in urban areas and specialize in implementing the following projects:

  • Cold storage for food preservationThe ideal solution for restaurants and 5-star hotels in the Dong Khoi and Le Thanh Ton areas, ensuring strict standards of food hygiene and safety.
  • Cold storage for pharmaceuticals and cosmeticsThe design strictly adheres to GSP standards for pharmacies and pharmaceutical distribution units, ensuring precise temperature and humidity control.
  • Seafood cold storagePreserves freshness and nutritional value with a deep temperature range of -18°C to -25°C, ensuring durable and stable operation.
  • Mini cold storage systemThis solution optimizes capacity in a small space, suitable for convenience stores and small businesses with limited floor space in the city center.

Besides District 1, to provide the fastest support to customers, Tan Long also offers services throughout neighboring districts such as Cold storage District 3Cold storage District 4 and Cold storage installation in District 2.

Why is Tan Long the top choice for customers in District 1?

Construction work in central areas like District 1 requires contractors to have strong execution capabilities and a deep understanding of the local area. Tan Long We are confident in being a reliable partner thanks to our outstanding advantages:

  • Extremely fast support: Tan Long's headquarters are located at 86 Dong Den Street, Tan Binh District – a strategic location right next to District 1. This allows our engineering team to be on-site for surveys or technical troubleshooting within 30-60 minutes, ensuring your cold chain supply remains uninterrupted.
  • Production and supply capacity: We own a large-scale factory in Duc Hoa 1 Industrial Park (Long An), giving us complete control over the production and supply of standard-compliant materials. Our core components include high-density PU panels and various product lines. cold storage door Specialized insulation and systems PLC control cabinet All items undergo rigorous testing before installation.
  • Modern surveillance technology: Anticipating the Industry 4.0 trend, Tan Long integrates a monitoring system. SCADA and IoT (Internet of Things) technology is integrated into the operation. This solution allows investors to easily manage the cold storage temperature range directly on their smartphones and receive instant incident alerts, optimizing management costs.
  • Technical specifications and smooth operation: The refrigeration systems we designed utilize compressors from leading global brands such as Bitzer (Germany) and Mycom (Japan). These devices not only ensure deep cooling performance but also operate extremely quietly, perfectly meeting the stringent noise standards of high-end residential areas and hotels in District 1.
Tan Long - The top choice for cold storage construction
Tan Long - The top choice for cold storage construction

Tan Long's process of providing cold storage installation services in District 1

The process of constructing and installing air conditioning systems in District 1 by Tan Long Standardized according to international technical standards, ensuring professionalism, safety, and optimal time efficiency for investors:

Step 1: Receiving information and advising on solutions

Any system consultation requests cold storage Information left via our website, hotline, or social media will be received and processed immediately by our team of specialists. We will contact you to confirm your specific needs (type of goods to be stored, area, desired temperature range) and propose a preliminary construction plan.

Step 2: The technical team conducts a site survey in District 1.

Immediately after receiving the request, Tan Long's engineering team will travel to the location in District 1 within 15 to 45 minutes. This on-site survey allows us to accurately assess the site, power supply, and specific technical factors in the central area to provide the most optimal solution.

Step 3: Provide a detailed quotation for cold storage construction.

Based on the survey results and customer needs, Tan Long will send a price list. Cold storage construction cost estimate Accurate, transparent, and comprehensive. We offer a range of solutions, from mini cold storage to large-scale industrial refrigeration systems, ensuring they fit your budget and ROI (return on investment).

Step 4: Proceed with professional installation and construction.

Once both parties agree on a plan, Tan Long will dispatch a team of skilled technicians along with materials (panels, compressors, electrical cabinets) to the site. The process follows. cold storage installation Strict control is maintained, ensuring adherence to the agreed-upon schedule and technical standards as stipulated in the contract, with absolutely no unexpected costs incurred.

Step 5: Operational testing and acceptance

After installation is complete, engineers will conduct system testing to check temperature stability and airtightness. cold storage door and the effectiveness of the control system. Only when the project meets all technical standards and operates smoothly will we proceed with handover and collect payment.

Step 6: Long-term maintenance and after-sales service policy

Cold storage construction services in District 1 always come with practical warranty and regular maintenance policies. With the advantage of a team on-site in Ho Chi Minh City, any technical issues that arise will be handled by our staff. Tan Long Refrigeration and Electrical Engineering We will provide immediate on-site support and troubleshooting, ensuring the absolute safety of the stored goods.

Process of providing cold storage installation service in District 1 of Tan Long
Process of providing cold storage installation service in District 1 of Tan Long

Cold storage installation price list in District 1, preferential and economical 

In reality, the cost cold storage installation District 1 will depend on several technical factors such as: warehouse size, insulation material (EPS/PU panel), and capacity. refrigeration compressor, and the accompanying smart feature requirements.

However, when making a choice Tan LongCustomers can rest assured about their investment budget. Thanks to our optimized and efficient process, from in-house material production to our dedicated construction team in Ho Chi Minh City, we help investors achieve their goals. Save from 5% to 15% in costs. compared to the general market average.

Below is a table of specifications and reference prices for popular cold storage models in District 1:

Reference price list for common types of cold storage

Type of storage Dimensions (LxWxH) Standard temperature Reference price
Cold storage (Food) 2m x 2m x 2.5m +2°C to +10°C [Contact for a quote]
Cold storage (Seafood) 3m x 2m x 2.5m -18°C to -22°C [Contact for a quote]
Generalized Pharmaceutical Storage Facility (GSP) Custom design +2°C to +8°C [Contact for a quote]

Technical notes:

  • The prices listed above are for reference only and represent standard configurations.
  • The actual price may vary depending on the brand of the compressor unit (Bitzer, Emerson, Mitsubishi, etc.) and the thickness of the material. cold storage panel and remote monitoring and control systems (IoT/SCADA).
Cold storage installation price list in District 1, preferential and economical 
Cold storage installation price list in District 1, preferential and economical

Key technologies integrated into Tan Long cold storage

Based on the latest technical standards of 2025, each project cold storage In District 1, services provided by Tan Long are equipped with the most advanced technologies to optimize efficiency and provide maximum protection for goods:

  • PLC control cabinetThis is the "brain" of the entire system, enabling complete automation of the defrosting process and precise temperature control. The system integrates advanced protection features such as overcurrent, phase imbalance, and phase loss protection, helping to... refrigeration compressor Reliable operation and minimized risk of technical malfunctions.
  • T-Light cold storage doorThis exclusive product is manufactured directly at our factory. Tan LongThe doors are molded from high-density PU foam and clad with 304 stainless steel to prevent rust in humid environments. With an absolutely airtight design, T-Light doors completely prevent heat loss, thereby saving significant energy for investors.
  • Remote monitoring systems (IoT & SCADA)We utilize IoT technology to allow business owners to monitor temperature history in real time. The system automatically sends alerts via text message or mobile app as soon as the temperature exceeds the permissible limit, helping you handle the situation promptly and avoid damage to valuable goods.

How to schedule cold storage installation in District 1 at Tan Long

To receive expert technical advice and ensure the fastest possible construction progress for your project. Cold storage in District 1Customers can connect with Tan Long through the following two flexible methods:

Method 1: Connect directly via Hotline or Zalo (24/7 support)

This is the fastest way for you to receive technical feedback and a preliminary quote. Our team of engineers is always ready to assist you at:

  • Hotline: 0933 357 058
  • Advantage: Receive on-site survey information in District 1 immediately and quickly answer questions about the process. cold storage construction.

Method 2: Submit a consultation request online via the website.

You can provide detailed information about your project (type of goods to be stored, area, specific location) by:

  • Access the page: Contact Tan Long
  • Fill out the consultation registration form and submit your request. Our customer service department will proactively contact you to discuss design options and schedule a site visit within just 30 minutes.

The Tan Long team is always ready to support cold storage projects in the heart of District 1.

Make an appointment for cold storage construction on Tan Long's website
Make an appointment for cold storage construction on Tan Long's website

Commitment when using cold storage design services in District 1 at Tan Long

Choosing a reputable contractor is key to ensuring stable system operation and optimizing costs. When you trust their services... Cold storage design in District 1 At Tan Long, we are committed to delivering exceptional value:

  • Free consultation and survey: Our team of experienced engineers will come directly to your site in District 1 to survey, measure, and provide technical solutions completely free of charge, ensuring the most optimal construction plan for your area.
  • ROI-optimized design solutions: We not only build cold storage facilities but also design the system to achieve the highest cooling efficiency with the lowest power consumption, helping businesses quickly recoup their investment.
  • Use materials that meet international standards: Tan Long We are committed to using only standard-compliant materials such as high-density compressed PU insulation panels. cold storage door Durable and with genuine compressor systems, ensuring a lifespan of over 15 years for the structure.
  • Transparency in construction: Any technical issues or material changes are thoroughly reported and discussed with the client before implementation, ensuring transparency and adherence to committed timelines.
  • Lightning-fast technical support: With the advantage of having our headquarters right next to District 1, we are committed to being on-site to handle any incidents within 2 hours, ensuring absolute safety for goods in the warehouse.

Select Tan Long Refrigeration and Electrical Engineering for construction and installation Cold storage in District 1 This is a wise decision that will give your business complete peace of mind regarding the quality of the construction and the effectiveness of your business operations.

Customers who require in-depth consultation on solutions are welcome to contact us. Cold storage installation in District 1Please contact us using the information below:

  • TAN LONG ELECTRICAL AND REFRIGERATION JOINT STOCK COMPANY
  • Headquarters: 86 Dong Den Street, Ward 14, Tan Binh District, Ho Chi Minh City.
  • Manufacturing plant: Duc Hoa 1 Industrial Park, My Hanh Nam Commune, Duc Hoa District, Long An Province.
  • 24/7 Hotline for advice: 0933 357 058
  • Official website: https://tanlongvn.com
  • Direct contact page: https://tanlongvn.com/lien-he/

Contact consultant

Tan Long's customers